In Game Name: b_ball18Have you read the in-depth application instruction: I have read the instructions.Do you have the applicable cost in your balance: yesHow did you make the funds for this application: by mining, farming and donations from other playersWhich town are you currently the Mayor of: Ballville https://www.ecocitycraft.com/forum/threads/mayor-application-b_ball18.168287/Which world will your new town be placed in: RisingWhat will be the name of your new town: HeatwaveWhat is the size of your town: 200x200Post A: -7373 72 6540Post B: -7373 71 6340Post C: -7173 72 6340Post D: -7173 70 6540Are there any towns within 15 blocks (This includes diagonally): no their is notAdditional information about your town: Have you read the server rules: Yes I have read the rules.Processing time is 1-7 days: I Understand.
Hey @b_ball18 Before we can process your application, I'm going to need you to edit in your mayor application under the town you are currently mayor of. In addition to this, your town posts should be labeled post A, B, C, and D along with the Town Name. Once these things are done, we should be all good to go to process your application. You'll have 24 hours to make this change. Left Open 24 Hours-Awaiting Changes.
@b_ball18 Congratulations on President and your new town, heatwave! Your next rank, Tycoon, awaits. Application approved, locked.