In Game Name: King_J_KHave you read the in-depth application instruction: I have read the instructions.Do you have the applicable cost in your balance: yesHow did you make the funds for this application: I made a contract with NSPGamerWhich world will your town be placed in: RisingWhat will be the name of your new town: EdgeWhat is the size of your town: 200x200Post A: Post A: X: 5785 Y: 71 Z: -14307Post B: Post B: X: 5785 Y: 71 Z: -14506Post C: Post C: X: 5586 Y: 71 Z: -14506Post D: Post D: X: 5586 Y: 71 Z: -14307Are there any towns within 15 blocks (This includes diagonally): noAdditional information about your town: Have you read the server rules: Yes I have read the rules.Processing time is 1-7 days: I Understand.
Wow congratulations @King_J_K , didn't you just get Resident yesterday? You may want to include the link to your town application in this as well, so its not corrected by mods.
Rename the town to "Edge" @King_J_K https://www.ecocitycraft.com/forum/threads/mayor-for-builder.157588/